SR flexible filler performance characteristics: unique, high plasticity, heat resistance, cold resistance, aging resistance, but also has the advantages of simple operation, non-toxic, tasteless, water resistance, good adhesion and other characteristics
(1)施工准备用钢筋台车将“SR”填料、“SR”防渗盖板、电镀角钢及电镀膨胀螺栓等运至相应的施工部位rhxs。
(1) the steel trolley for construction preparation will transport the "SR" filler, "SR" impervious cover plate, electroplating angle steel and electroplating expansion bolt to the corresponding construction site rhxs.
(2)嵌缝处理用钢刷将预留“v”槽内两侧清理干净,再用水冲洗槽内外,除去缝面上的灰砂。“V”槽清理干净后自然晾干。
(2) the steel brush will be reserved for the "V" slot on both sides of clean caulking treatment, then rinse tank inside and outside, remove seam on the surface of the sand. The "V" groove is cleaned and dried naturally.
(3)“SR”填料填缝用黏合剂将槽内、外壁均匀涂刷一遍,外壁要相应涂刷的宽一些,不可漏刷。黏合剂刷好晾1h后,手感快干时,先在槽底沿槽走向放置一条PVC棒。再将“SR”填料均匀切成条状压入槽内,并在外壁按设计要求的弧状堆起2cm高。最后用手捶捶紧,嵌填一定要密实。“SR”填料嵌填完毕后,要及时盖上“SR”防渗盖板,再用冲击钻钻孔,安装电镀角钢后埋设10 x75电镀膨胀螺栓,间距为400mm。利用电镀角钢通过电镀膨胀螺栓将“SR”防渗盖板嵌固在砼上。
(3) "SR" filler filling adhesive will be in the groove, the outer wall uniform brushing again, the outer wall to the corresponding brushing wider, can not leak brush. After the adhesive brush is dry 1H, when the handle is quick drying, first put a PVC bar at the bottom of the groove along the groove. Then the "SR" uniform filler strips pressed into the groove, and the outer wall of the arc-shaped pile according to the design requirements of 2cm high. Finally, use your hand to punch it tight, and to fill it, it must be dense. After filling the "SR" filler, it is necessary to cover the "SR" impervious cover in time, and then use impact drilling to install the galvanized angle steel, and then bury 10 x75 plating expansion bolt, the distance is 400mm. The "SR" impervious plate is embedded in concrete by electroplating angle steel through electroplating expansion bolt.