0811404455现货
0811404710现货
0811404041现货The final report is delivered as a printed copy, with accompanying data on a CD. Cracks and crack-like data are prioritized by severity for convenient assessment by the pipeline operator.
0831006003现货
0811404035现货
0811404026现货
0811404603现货
0811404553现货所有测量和处理任务都在一个软件工具和集成化的硬件平台上完成.
0831006030现货
0811404020现货
0811404742现货
0831006057现货
0811404618现货
0811404304现货
0811404034现货
0811404221现货
0811404658现货
0811404141现货
0811404100现货 “General Electric has an impressive history and a strong
reputation as a technology company. At the same time, StatoilHydro
has developed and been a brave user of a number of innovative
technologies and solutions. By cooperating with concrete technology
development projects within certain areas, we believe we will
mutually benefit. We also intend to share experience within
R&D, Innovation and HR practices. This will hopefully stimulate
and assist both companies to further improve our ways of doing
technology development”, says Margareth Øvrum,
Executive Vice President for Technology and New Energy in StatoilHydro.
0811404553现货
0811006030现货
[FILE3]
0811404634现货
0811404742现货
0831006057现货
0811404300现货
0811404551现货
0811404086现货
0811404409现货
0811404132现货Recently, GE Oil & Gas completed tests on the highest pressure sour gas re-injection train ever built, which is scheduled for installation at the Kashagan oil field of the North Caspian Sea, off the coast of Kazakhstan. Based on well-proven re-injection train architecture that incorporates a GE Frame 5-2D gas turbine and three BCL centrifugal compressors, the turbo-compression train reached 820 bar pressure during full density tests, topping the former record of 690 bar, also achieved by GE technology.
0811404304现货
0811404315现货
0811404656现货
0811404140现货